Posted on August 1, 2008 in Dismantling of formwork and scaffolding
Upon reaching the required concrete strength is its raspalublivanie in sequence. First, remove the locking screws or wire ties are cut, removed horizontal contractions. Within the limits between adjacent vertical bracket (braces), supporting the formwork, taken away the edge. Then removed the side elements - form panels of columns, beams and purlins. Next, understand shuttering plates, the bottom formwork girders, together with supporting [...]
Tags:
